The Valley01Masterplan02Residences03Experiences04Investment05Gallery06Contact07
Enquire
The masterplan

Two valleys, from sunrise to moonlight

Home/Masterplan
Overview

Planned with restraint, built with the land

The masterplan covers 237.03 hectares in To Mua Commune, organised as two complementary valleys along the Suoi Tan stream and nine themed precincts.

Quiet residential precincts are separated from the lively public heart, so that privacy and vitality each have their place. Buildings rise no more than five storeys and follow the natural contours of the hills.

237ha
Total masterplan area
9precincts
Themed villages, reserves and public squares
11%
Overall building density
300,000
Visitors per year at design capacity
Masterplan aerial

Artist’s impression — the two valleys along the Suoi Tan stream

Zone A · 133.9 hectares

The Sun — where the clouds rest

The upper valley, where water breaks white like cloud and morning mist lies over the terraces. A tranquil setting for the flagship hotel, the hillside villa villages and the mineral-spring wellness centre.

01

The Sun ArrivalArrival & events

The Gate of Light, the 6,000 m² Sun Plaza, reception pavilion, pedestrian street, tea garden and boat landing.

02

Nang Tien Falls ReserveNature reserve

Protected core landscape with forest walkways, viewing decks and rest pavilions.

03

Sunrise VillageFlagship resort

The heart of the project: five-star hotel, hillside bungalows with private pools, onsen and hydrotherapy spa, infinity pool and a golf practice range.

04

Misty Ridge VillagePrivate villas

Detached villas on a gentle ridge with a riverside restaurant, clubhouse, wellness cluster and azalea gardens.

05

Morning Mist VillageFamily villas

Villas for families and small groups, with clubhouse, restaurant and bar, a café beneath the forest canopy and azalea gardens.

Zone B · 103.13 hectares

The Moon — valley of harmony

Along the Chieng Khoa stream, the lower valley is the centre of culture and community: festival street, flower valley and resort villages alive with music, cuisine and craft.

06

Sunset VillageStilt-house villas

West-facing hillside retreat in the local stilt-house tradition, with family pool and the valley zipline departure.

07

Starlight VillageVillas & glamping

Alpine-inspired villas, waterfall-side resort, glamping, four-season flower park and a farm-to-table garden.

08

The Moon Festival StreetCulture & commerce

Festival square, seasonal night market, shophouses, cafés, natural water park and mineral bathing.

09

Chieng Khoa Falls ReserveNature reserve

The seven-tier falls, preserved almost untouched, with walking trails and viewpoints.

At a glance

The development programme

A summary of what the masterplan provides across the two valleys.

ComponentZone A · The SunZone B · The MoonTotal
Accommodation
Resort hotel roomsFive-star hotel in Zone A · three-star hotel in Zone B≈ 591 rooms≈ 556 rooms≈ 1,147 rooms
BungalowsDetached bungalows, 45 m²146 units—146 units
Resort villasSunrise 73 · Misty Ridge 332 · Morning Mist 210 · Starlight & Sunset 284615 units284 units899 units
ShophousesPedestrian shopping streets, 60 m²••49 units
Wellness, dining & events
Wellness centresMineral bathing, herbal therapy, physiotherapy, spa2.4 ha2.2 ha4.6 ha
Dining, conference & event venuesRestaurants, meeting halls, weddings and celebrations5.6 ha1.8 ha7.4 ha
ClubhousesDining, pool bar, sport and youth club1.8 ha0.3 ha2.1 ha
Arrival & operations centresReception, ticketing, retail, offices1.3 ha1.1 ha2.4 ha
Festival squaresThe Sun Plaza · The Moon Square0.5 ha0.9 ha1.4 ha
Leisure & recreation
Theme parksGolf practice range · water park, four-season flower park, farm, camping & glamping1.2 ha11.9 ha13.1 ha
Indoor entertainmentIndoor play centre, cinema, observation wheel—1.8 ha1.8 ha
AdventureValley zipline, canopy walk, viewing towers•••
Central parking & e-buggy hubsCoaches, cars and electric buggies2.4 ha2.0 ha4.4 ha
Protected & open landscape
Waterfall reservesNang Tien Falls · Chieng Khoa Falls11.1 ha4.8 ha15.9 ha
Forest43.2 ha33.7 ha76.9 ha
Landscape gardens21.5 ha8.9 ha30.4 ha
Rice terraces11.8 ha9.5 ha21.2 ha
Water surface7.6 ha7.9 ha15.5 ha
Land area133.9 ha103.13 ha237.03 ha
Building density11.56%11.12%11.37%
Gross floor area342,593 m²198,072 m²540,665 m²
Maximum height5 storeys3 storeys5 storeys

Indicative figures from the concept masterplan; subject to detailed planning and design. • = provided, quantity to be confirmed.

Lakeside aerial
Stewardship

Two-thirds of the estate stays green

Forest, farmland, water and gardens together make up around two-thirds of the land. The landscape is the principal asset of the project — and is planned accordingly.

  • Forest≈ 77 ha
  • Landscape gardens≈ 30 ha
  • Rice terraces≈ 21 ha
  • Waterfall reserves≈ 16 ha
  • Water surface≈ 15 ha
Design principles

The commitments that guide the plan

01

Conserve the natural structure

Waterfall, stream, terrace and forest form the landscape core. Development proceeds point by point, without mass earthworks.

02

Green wellness

Onsen, detox and yoga draw on spring water, medicinal herbs and the cool climate.

03

Culture as the soul

Markets, cuisine, craft, music and festivals are woven into the hospitality spaces.

04

Many layers, many guests

From day visitors and families to discerning travellers, each precinct offers its own rhythm: stillness, energy, discovery, renewal.

05

Growth with community

Controlled, phased growth that shares value with local people and trains local talent.

06

Electric mobility

Central parking at the gateways, with electric buggies and shuttles linking every precinct.

Phasing

A clear path to opening

Development proceeds in two phases under the approved implementation schedule — from approval to full operation in five and a half years.

Approval
Q32026

Investment policy and investor approved

First opening
Q32029

Phase 1 trial operation — Zone B, The Moon

Full operation
Q12032

The complete estate in operation

  1. Q3 2026 – Q1 2027

    Preparation

    Land, construction and environmental procedures.

    9 months
  2. Q2 2027 – Q2 2029

    Phase 1 construction

    Zone B — The Moon.

    27 months
  3. Q3 2029

    Phase 1 trial operation

    Zone B begins operation.

  4. Q3 2029 – Q4 2031

    Phase 2 construction

    Zone A — The Sun.

    30 months
  5. Q1 2032

    Full operation

    The complete estate in operation.

Schedule as set out in the investment approval; subject to implementation progress.